Hunter Valley Grammar Early Education Centre

In delivering this modern Early Education Centre, Paynter Dixon deftly navigated site constraints, authority approvals and an occupied school environment. Going the extra mile ensured the centre was delivered on time and inside budget.

The construction works consisted of in-ground services, ground floor piers and slabs, steel walls, roof framing and cladding. Meanwhile, the fit-out incorporated services for bathrooms, classrooms and covered walkways.

From the outset of design, Paynter Dixon’s in-house estimating services played a key role in effectively managing the budget. This process provided real time updates on budgeting and informed the design development process with the school.

While the site’s steep slope presented a challenge to construction, the resulting cut-to-fill excavation was performed with optimal efficiency. Costs to the school were further reduced by ensuring all excavated material remained on site.

Our team also worked closely with the School and the Department of Community Services to ensure the current Child Care licence was transferred seamlessly between facilities.