News

Paynter Dixon has successfully completed Travelodge Hotel Bankstown, Levels 9 & 10 fitout!!

By December 2, 2019 No Comments

Works included 54 rooms with the existing Travelodge Hotel operating as normal below with minimum disruption. The project required difficult materials handling via tower crane with landing platforms constructed on the northern face of the building and limited use of the goods lift from the loading dock. Finishes and Services installation match the existing hotel fitout on lower levels.